Documents de recerca

Documents de recerca 23 registres trobats  inicianterior13 - 22següent  anar al registre: La cerca s'ha fet en 0.00 segons. 
13.
66 p, 1.2 MB D2.3 : Proposal of EVs for selected themes / Bombelli, Antonio ; Maso, Joan (Centre de Recerca Ecològica i d'Aplicacions Forestals) ; Serral i Montoro, Ivette (Centre de Recerca Ecològica i d'Aplicacions Forestals) ; Plag, Hans-Peter ; Jules-Plag, Shelley ; Blonda, Palma ; Nativi, Stefano ; ConnectinGEO
Report on the first proposal of EVs for selected themes. It will include description and justification of inclusion. It will collect drafts of SBA-specific EVs for Carbon (CMCC), Health and Pollution (CNR-IIA), Ecosystems (CNRISAC), Biodiversity (CNR- ISSIA), Energy (ARMINES), Disasters (TIWAH) and Oceans (CSIC). [...]
2016  
14.
22 p, 1.4 MB D4.2. Observation inventory description and results report / Santoro, Mattia ; Nativi, Stefano ; Maso, Joan (Centre de Recerca Ecològica i d'Aplicacions Forestals) ; Jirka, Simon ; ConnectinGEO
The ConnectinGEO Observation Inventory (OI) is created and populated using the current information in the metadata concentrated in the GEO Discovery and Access Broker (DAB) of the GEOSS Common Infrastructure (GCI) to analyse the observations and measurements currently available in it. [...]
2016  
15.
28 p, 1.4 MB D7.1. Plan for disseminating and communication of the project's results / Serral i Montoro, Ivette (Centre de Recerca Ecològica i d'Aplicacions Forestals) ; Maso, Joan (Centre de Recerca Ecològica i d'Aplicacions Forestals) ; Menard, Lionel ; Plag, Hans-Peter ; Sawyer, Geoff ; Miguel Lago, Monica ; ConnectinGEO
The Dissemination and Communication Plan will set out the details of the different types of dissemination activities to be undertaken during the project lifetime. In addition to the dissemination approach that will be applied, this deliverable also provides the necessary guidance for an efficient dissemination strategy. [...]
2015  
16.
20 p, 190.0 KB D6.1. ConnectinGEO methodology / Maso, Joan (Centre de Recerca Ecològica i d'Aplicacions Forestals) ; ConnectinGEO
Describing the ConnectinGEO methodology to be developed and tested during the project and to be promoted beyond the end of it.
The main aim of the ConnectinGEO methodology is to find gaps in EO networks and systems (mainly in-situ or non-space), determine remedies and recommendpriorities to solve these gaps. The gap analysis phase follows five different threads: Top-Down thread 1: Identification of a collection of observation requirements Top-Down thread 2: Research programs aims and targets Bottom-up thread 1: Consultation process Bottom-up thread 2: GEOSS Discovery and Access Broker analysis Bottom-up thread 3: industry-driven challenges. [...]
Then, a period for reviewing the gaps and identifying remedies will start. The quantifications of the impact, the feasibility and the costs will permit the application of a semi automatic priority calculation. [...]

2015  
17.
15 p, 455.8 KB D5.1. Common criteria in the project stakeholder and industry challenges / Maso, Joan (Centre de Recerca Ecològica i d'Aplicacions Forestals) ; Menard, Lionel ; Miguel Lago, Monica ; Plag, Hans-Peter ; Santoro, Mattia ; ConnectinGEO
Report gathering the common challenges criteria to be applied in the project through the stakeholder and industry challenges pilot cases.
2015  
18.
16 p, 323.8 KB D4.1. Observation inventory requirements, database schema and queryable fields / Nüst, Daniel ; Nativi, Stefano ; Maso, Joan (Centre de Recerca Ecològica i d'Aplicacions Forestals) ; Van der Broek, Maud ; Jirka, Simon ; ConnectinGEO
Report on the observation inventory requirements, database schema and queryable fields to be adopted during the project. The observation inventory will be based on GCI Information, DAB, and Copernicus services catalogues.
2015  
19.
39 p, 896.2 KB D3.2. ENEON methodology for management and coordination and first plenary Workshop minutes / Plag, Hans-Peter ; Mcallum, Ian ; Serral, Ivette ; Maso, Joan (Centre de Recerca Ecològica i d'Aplicacions Forestals) ; ConnectinGEO
The report on the ENEON plenary Workshop (WS2) will gather the minutes and all the information regarding the plenary. The workshops will also be used to build a collection of frameworks and best practices across domains and stakeholders that will be collected in this deliverable. [...]
2015  
20.
15 p, 840.5 KB D3.1. Data Management Plan (DMP) / Maso, Joan (Centre de Recerca Ecològica i d'Aplicacions Forestals) ; Serral i Montoro, Ivette (Centre de Recerca Ecològica i d'Aplicacions Forestals) ; ConnectinGEO
Report on the Data Management Plan (DMP) elaboration and execution, in which will be specified what data will be open in ConnectinGEO as the project is participating in the Open Research Data Pilot. The document will outline how research data will be handled during a research project, and after it is completed and will follow the template in Annex 1 for the EC DMP guidelines document http://ec. [...]
2015  
21.
91 p, 5.2 MB D2.2. EVs current status in different communities and way to move forward / Bombelli, Antonio ; Serral, Ivette (Centre de Recerca Ecològica i d'Aplicacions Forestals) ; Blonda, Palma ; Maso, Joan ; Plag, Hans-Peter ; Jules-Plag, Shelley ; McCallum, Ian ; ConnectinGEO
Report on the Essential Variables current status in the scientific community and the strategy to push them forward. This report summarizes the results of the workshop "Towards a sustainability process for GEOSS Essential Variables (EVs)," at which the current status of the EV discussions in a number of communities was reviewed and recommendations for the further development of a general process for the identification and validation of the EVs were developed.
2015  
22.
81 p, 3.4 MB D2.1. SDG Workshop Report. "Navigating Sustainability on a Changing Planet" / Plag, Hans-Peter ; Serral, Ivette (Centre de Recerca Ecològica i d'Aplicacions Forestals) ; Jules-Plag, Shelley ; Maso, Joan ; ConnectinGEO
The report summarizes the Workshop on Sustainable Development Goals titled "Navigating Sustainability on a Changing Planet," at which the methodology for linking societal goals to Essential Variables (EVs) was discussed. [...]
2016  

Documents de recerca : 23 registres trobats   inicianterior13 - 22següent  anar al registre:
Us interessa rebre alertes sobre nous resultats d'aquesta cerca?
Definiu una alerta personal via correu electrònic o subscribiu-vos al canal RSS.