Resultats globals: 10 registres trobats en 0.03 segons.
Documents de recerca, 9 registres trobats
Dades de recerca, 1 registres trobats
Documents de recerca 9 registres trobats  
1.
22 p, 1.4 MB D4.2. Observation inventory description and results report / Santoro, Mattia ; Nativi, Stefano ; Masó Pau, Joan (Centre de Recerca Ecològica i Aplicacions Forestals) ; Jirka, Simon ; CONNECTINGEO
The ConnectinGEO Observation Inventory (OI) is created and populated using the current information in the metadata concentrated in the GEO Discovery and Access Broker (DAB) of the GEOSS Common Infrastructure (GCI) to analyse the observations and measurements currently available in it. [...]
2016  
2.
28 p, 1.4 MB D7.1. Plan for disseminating and communication of the project's results / Serral i Montoro, Ivette (Centre de Recerca Ecològica i Aplicacions Forestals) ; Masó Pau, Joan (Centre de Recerca Ecològica i Aplicacions Forestals) ; Menard, Lionel ; Plag, Hans-Peter ; Sawyer, Geoff ; Miguel Lago, Monica ; CONNECTINGEO
The Dissemination and Communication Plan will set out the details of the different types of dissemination activities to be undertaken during the project lifetime. In addition to the dissemination approach that will be applied, this deliverable also provides the necessary guidance for an efficient dissemination strategy. [...]
2015  
3.
20 p, 190.0 KB D6.1. ConnectinGEO methodology / Masó Pau, Joan (Centre de Recerca Ecològica i Aplicacions Forestals) ; CONNECTINGEO
Describing the ConnectinGEO methodology to be developed and tested during the project and to be promoted beyond the end of it.
The main aim of the ConnectinGEO methodology is to find gaps in EO networks and systems (mainly in-situ or non-space), determine remedies and recommendpriorities to solve these gaps. The gap analysis phase follows five different threads: Top-Down thread 1: Identification of a collection of observation requirements Top-Down thread 2: Research programs aims and targets Bottom-up thread 1: Consultation process Bottom-up thread 2: GEOSS Discovery and Access Broker analysis Bottom-up thread 3: industry-driven challenges. [...]
Then, a period for reviewing the gaps and identifying remedies will start. The quantifications of the impact, the feasibility and the costs will permit the application of a semi automatic priority calculation. [...]

2015  
4.
15 p, 455.8 KB D5.1. Common criteria in the project stakeholder and industry challenges / Masó Pau, Joan (Centre de Recerca Ecològica i Aplicacions Forestals) ; Menard, Lionel ; Miguel Lago, Monica ; Plag, Hans-Peter ; Santoro, Mattia ; CONNECTINGEO
Report gathering the common challenges criteria to be applied in the project through the stakeholder and industry challenges pilot cases.
2015  
5.
16 p, 323.8 KB D4.1. Observation inventory requirements, database schema and queryable fields / Nüst, Daniel ; Nativi, Stefano ; Masó Pau, Joan (Centre de Recerca Ecològica i Aplicacions Forestals) ; Van der Broek, Maud ; Jirka, Simon ; CONNECTINGEO
Report on the observation inventory requirements, database schema and queryable fields to be adopted during the project. The observation inventory will be based on GCI Information, DAB, and Copernicus services catalogues.
2015  
6.
39 p, 896.2 KB D3.2. ENEON methodology for management and coordination and first plenary Workshop minutes / Plag, Hans-Peter ; McCallum, Ian ; Serral, Ivette ; Masó Pau, Joan (Centre de Recerca Ecològica i Aplicacions Forestals) ; CONNECTINGEO
The report on the ENEON plenary Workshop (WS2) will gather the minutes and all the information regarding the plenary. The workshops will also be used to build a collection of frameworks and best practices across domains and stakeholders that will be collected in this deliverable. [...]
2015  
7.
91 p, 5.2 MB D2.2. EVs current status in different communities and way to move forward / Bombelli, Antonio ; Serral, Ivette (Centre de Recerca Ecològica i Aplicacions Forestals) ; ConnectinGEO
Report on the Essential Variables current status in the scientific community and the strategy to push them forward. This report summarizes the results of the workshop “Towards a sustainability process for GEOSS Essential Variables (EVs),” at which the current status of the EV discussions in a number of communities was reviewed and recommendations for the further development of a general process for the identification and validation of the EVs were developed.
2015  
8.
81 p, 3.4 MB D2.1. SDG Workshop Report. “Navigating Sustainability on a Changing Planet” / Plag, Hans-Peter ; Serral, Ivette (Centre de Recerca Ecològica i Aplicacions Forestals) ; CONNECTINGEO
The report summarizes the Workshop on Sustainable Development Goals titled “Navigating Sustainability on a Changing Planet,” at which the methodology for linking societal goals to Essential Variables (EVs) was discussed. [...]
2016  
9.
17 p, 193.5 KB D1.1. Project Advisory Board composition and communication channels / Masó Pau, Joan (Centre de Recerca Ecològica i Aplicacions Forestals) ; Serral i Montoro, Ivette (Centre de Recerca Ecològica i Aplicacions Forestals) ; CONNECTINGEO
This deliverable exposes the current status of the Project Advisory Board and possible collaborations with three relevant projects: ENVRIPLUS, BACI and GAIA-CLIM.
2015  

Dades de recerca 1 registres trobats  
1.
15 p, 840.5 KB D3.1. Data Management Plan (DMP) / Masó Pau, Joan (Centre de Recerca Ecològica i Aplicacions Forestals) ; Serral i Montoro, Ivette (Centre de Recerca Ecològica i Aplicacions Forestals) ; CONNECTINGEO
Report on the Data Management Plan (DMP) elaboration and execution, in which will be specified what data will be open in ConnectinGEO as the project is participating in the Open Research Data Pilot. The document will outline how research data will be handled during a research project, and after it is completed and will follow the template in Annex 1 for the EC DMP guidelines document http://ec. [...]
2015  

Us interessa rebre alertes sobre nous resultats d'aquesta cerca?
Definiu una alerta personal via correu electrònic o subscribiu-vos al canal RSS.